Traffic

Nov 16, 2012 6:01 PM by Siera Santos, ssantos@koaa.com

Street repairs starting Nov. 19 in Colorado Springs

The following are potential road restrictions from Nov. 19 - 23 between 6:00 a.m. and 6:00 p.m. and are subject to change because of weather conditions, equipment failure and resource scheduling changes.

 

City Asphalt Repair Work:

  • 3905-3925 Half Turn Pl (Edgeline)
  • Siferd Blvd and Rosalie St (Minor Digout)
  • Parkside Dr and Pikes Peak Av (Minor Digout)
  • Barkman Cir and Angelina Dr (Minor Digout)

**Note: Work could possibly have traffic shifted to one lane**

 

 

Drainage Repair Work:

  • Douglas Creek and Vondel Park Dr (Slope Erosion)
  • Broadmoor Hills Dr (Channel Cleaning)

**NOTE: Work could possibly have traffic shifted to one lane**

 


City Concrete Repair Work:

  • 1701 Cascade Av N Address (Sidewalk/Curb/Gutter)

**NOTE: Work could possibly have traffic shifted to one lane**

 


PPRTA Concrete Repair Work:

  • Fontmore Rd Mesa Rd to 30th St
  • Chelton Rd Jet Wing Dr to Hancock Expwy
  • Rangewood Dr Woodmen Rd to Austin Bluffs Pkwy

**NOTE: Work could possibly have traffic shifted to one lane**

 

»Comments

More News

National
Story Photo

1 hour ago

Soldier's remains return

After a decades-long mystery, the family of a World War II soldier finally has some closure. Army Sgt. William Carneal, who disappeared...

Weather - Forecast
Story Photo

16 minutes ago

Cooler Thursday

Windy early with blowing dust in some areas. Wind ending overnight tonight. An isolated thunderstorm possible early. Overnight low temperatures will drop...

Most Popular

Top Videos

1 2 3 4